Industrial Instrumentation and Control
From P&ID and Process Measurement to PID Control, Protection Systems, and DCS
Industrial and mining engineering: simulation, standards, and field practices.
Industrial Instrumentation and Control
From P&ID and Process Measurement to PID Control, Protection Systems, and DCS
Professional PLC & SCADA Mastery: Design, Control, And Optimize Industrial Automation Systems
Industrial Automation Mastery with Schneider Modicon
System Design, Energy Integration, and Project Feasibility Analysis
Design of Residential/Office-Scale Solar PV Systems with On-Grid and Off-Grid Configurations
On-Grid & Off-Grid Design, PVSyst Simulation, and Economic Analysis
Regulations, Inspections, and Strategies for Reducing Industrial Electrical Downtime
Power System Analysis Using ETAP Basic to Intermediate
Basic to Intermediate · Load Flow · Harmonics · Short Circuit · Arc Flash
Single-Line Diagram Design & Electrical Power Distribution System for Multi-Storey Buildings
Electric Power for Multi-Storey Buildings
Mastering On-Grid PLTS Design 1.8 MWp
Continuous Improvement: Toyota Production System & PDCA Implementation
& PDCAImplementation
H2S Gas Handling & Work in Confined Spaces
& Working in Confined Spaces
Internal Audit of Quality Management System Based on ISO 19011
Based on ISO 19011
QA/QC Operation: Integrating Quality into Every Process
Integrating Quality into Every Process
Build an Effective Occupational Safety Management System
Occupational Health and Safety (OHS) for Oil & Gas and Mining
Master the K3 (Occupational Health and Safety) Standards for Oil and Mining
“Kl ingin faham mengenai Safety Managment System, ikutilah Training yg diadakan oleh Taalenta. Bahasanya muda, materinya mendunia dan cara penyampainnya sangat lugas.”
“Pelatihan dengan biaya sangat terjangkau, menghadirkan narasumber yang kompeten di bidangnya.”
“Sangat baik, sangat membantu saya menambah kompetensi, terima kasih Talenta”
“Talenta sangat membantu fresh graduate seperti saya dengan membuat webinar atau e course yang berisi ilmu bermanfaat buat saya kedepannya”
“penjelasan yang mudah di pahami untuk kawan2 yang baru mau bekerja pun sangat mudah untuk di pahami”
“sudah bagus mungkin kualitasnya ditingkatkan dari mc nya boleh dari luar biar menarik”
Batas Waktu Simpan Limbah B3: 90, 180, dan 365 Hari serta Cara Menghitungnya
Aturan P2K3 Diganti: Ambang Wajib, Komposisi, dan Laporan Enam Bulan
Genset Justru Boros Saat Bebannya Ringan: Ambang 30 Persen yang Sering Terlewat
Berapa Jam Baterai Cadangan Perlu Bertahan, dan dari Mana Angkanya
PBJT, Bukan PPJ: Kenapa Token Listrik Tidak Sesuai Nominal
Empat Bentuk Jaminan Reklamasi Menyusut Jadi Satu, Tenggatnya 20 Hari Kerja