The process improvement team usually rushes to eliminate muda: stock piles up, people wait, items are moved back and forth. The results are quickly visible. However, a few months later, the same waste returns to the same place. The causes often lie in two other Ms that are rarely discussed, namely mura and muri.
Three terms, three different ailments
| Term | Meaning | Symptoms on the shop floor | Common countermeasures |
|---|---|---|---|
| Muda | activities that use resources without adding value for the customer | stock piles up, people wait, items are repeatedly moved, rework | kaizen, reorganizing the flow into work cells |
| Mura | unevenness: work schedules or rhythms fluctuate due to the system itself, not because of customer demand | operators rush and then are idle; one table has a long queue while the next one is empty | heijunka (leveling production schedules), kanban |
| Muri | overburden on machines or people, exceeding what was designed | overtime becomes routine, machines frequently break down due to being pushed, cycle times are too tight | balancing rhythm with takt time, standard work |
Toyota categorizes muda into seven types, from transportation to product defects, and some practitioners add an eighth type. The details can be found in the article Lean Manufacturing: It's Not About Saving, But About Being Smart. This article focuses on the other two Ms.
Not all muda can be eliminated today
The Lean Enterprise Institute (LEI) distinguishes between two types of muda. Type one does not add value but cannot be eliminated immediately. An example is rework after painting booths, which is still necessary until the painting process is reliable enough. Type two can be quickly eliminated through kaizen, such as the movement of items between processes that disappears once the machine and operator are brought closer together into one cell.
The distinction is important for planning. Forcing type one muda to disappear in one workshop usually ends with missed targets.
Why the order is reversed
In the mid-1980s, the MIT automotive research team that later introduced the term "lean" used the order of muda, mura, muri as steps for improvement. The reason was practical: many muda could be eliminated in one area without needing permission from other departments.
Twenty years later, James Womack, one of the leaders of that team and then chairman of LEI, wrote that the order needed to be reversed. He argued that mura and muri have now become the root causes of muda in many organizations. Worse, both can bring back muda that has already been eliminated. An example he raised came from American car manufacturers: a large incentive program to deplete stock caused a temporary spike in sales, leading factories to overproduce, stock to pile up again, and incentives to be rolled out once more.
His suggestions can be summarized into three questions:
- Why is the variation in your activities greater than the variation in customer demand?
- How can the actual variation in demand be leveled internally to stabilize operations?
- How can the overburden on machines and people be continuously reduced?
Once operations are stable, according to Womack, muda disappears more quickly and does not return.
Also applicable in the office
Mura is not just a factory issue. Ken Eakin, writing for LEI, illustrates this with the loan administration department at the financial institution where he works. Initially, each employee handled a group of regular customers. Customer cycles varied, causing some team members to be overwhelmed while others were idle.
The solution: all procedures were documented, employees were cross-trained, workstations were rotated weekly, and 10 to 20 percent of employees served as backups to assist wherever the workload was piling up. Since 2011, that department has handled three times the loan volume per employee, while customer satisfaction remains high.
If only muda were pursued, such as reducing the error rate per person, the uneven workload that triggers those errors would not be addressed.
How to apply it tomorrow morning
Before starting a waste reduction project, try looking at your team's workload graph per day over a month. If the line is jagged while customer orders are relatively flat, that indicates mura. If the peaks are always accompanied by overtime or broken equipment, that indicates muri. Address those two issues first, then tackle muda.
If you prefer to see the explanation through visual examples, there's a clip here.
Sources
- Lean Enterprise Institute, Lexicon "Muda, Mura, Muri": https://www.lean.org/lexicon-terms/muda-mura-muri/
- Toyota UK Magazine, "Muda, Muri, Mura: Toyota Production System guide": https://mag.toyota.co.uk/muda-muri-mura
- James P. Womack, "Mura, Muri, Muda?", The Lean Post, Lean Enterprise Institute (July 6, 2006): https://www.lean.org/the-lean-post/articles/mura-muri-muda/
- Ken Eakin, "What Ever Happened to Mura?", The Lean Post, Lean Enterprise Institute (December 6, 2019): https://www.lean.org/the-lean-post/articles/what-ever-happened-to-mura/