The People's Mining Permit (IPR) is often seen as the finish line. The decision letter is in hand, so the permit issue is considered resolved. However, since the issuance date, the clock has already started ticking. The law gives IPR holders three months to begin mining, and before the first equipment moves, there are documents that must be prepared.

This article summarizes the figures and prohibitions that apply as of November 2026, following the last two amendments: Law 2/2025 (the fourth amendment to the Mineral and Coal Law) and Government Regulation 39/2025 (the second amendment to Government Regulation 96/2021).

Limits Established by Law

Aspect Provision Basis
Who is allowed individuals who are local residents, or cooperatives whose members are local residents Article 67 of Law 3/2020
Maximum area individual 5 hectares, cooperative 10 hectares Article 68 paragraph (1) of Law 3/2020
Duration maximum of 10 years, can be extended 2 times, each for 5 years Article 68 paragraph (2) of Law 3/2020
Number of permits one applicant can only obtain one IPR Article 62 paragraph (4) of Government Regulation 96/2021
Location only in areas designated as WPR Article 62 paragraph (2) of Government Regulation 96/2021

Law 2/2025 does not change the above articles. What has changed through Government Regulation 39/2025 is the location requirement: applications can now only be submitted in WPR that already has a WPR management document established by the Minister. Therefore, a newly designated WPR on the map is not sufficient.

On paper, the permit is issued by the Minister. In practice, it is the provincial government that issues it through the delegation of Presidential Regulation 55/2022, and the WPR management document is the reference for the province when issuing the IPR (Ministerial Decree ESDM 174.K/MB.01/MEM.B/2024, Third Dictum).

The First Three Months After IPR Issuance

Article 65 of Government Regulation 96/2021, as amended by Government Regulation 39/2025, regulates the sequence:

  1. Prepare a mining plan based on the WPR management document. It must contain at least five elements: mining method, equipment and supplies, work schedule, personnel requirements, and costs or capital.
  2. Submit the plan to the provincial government. The guidelines in Ministerial Decree ESDM 174 state that mining can only begin after this document is submitted.
  3. Start mining no later than 3 months after the IPR is issued. This deadline is stated in Article 70 letter a of Law 3/2020 and reiterated in Article 65 paragraph (1) of Government Regulation 96/2021.

Since the deadline is calculated from the issuance date, the time to prepare the plan also counts against the three-month allowance. The provincial government is responsible for assisting in its preparation, so seeking assistance from the beginning is safer than waiting.

Obligations During the Permit's Validity

Obligation Basis
Comply with mining safety and environmental management regulations Article 70 letter b of Law 3/2020
Manage the environment in collaboration with the Minister Article 70 letter c
Pay the People's Mining Fee (IPERA), a provincial levy Article 70 letter d; Ministerial Decree ESDM 174 Appendix VI
Report activities periodically; guidelines specify every 3 months to the province Article 70 letter e; IPR SK format in Ministerial Decree ESDM 174 Appendix II

Proof of IPERA payment for the last three years is also a requirement for extension, along with a coordinate map, environmental and production reports, and a mining plan for the extension period. Any outstanding fees today will hinder future extensions.

Four Technical Prohibitions and One Legal Prohibition

Article 66 paragraph (2) of Government Regulation 96/2021 establishes minimum technical requirements:

  • no use of explosives;
  • no use of hazardous and toxic materials prohibited by regulations;
  • individuals are not allowed to mine using underground methods (this prohibition refers to individuals, not cooperatives);
  • apply good mining engineering principles, especially environmental management and safety.

The fifth prohibition is found in Article 70A of Law 3/2020: IPR cannot be transferred to another party. Selling or "lending" the permit to investors from outside the region falls under this prohibition.

If Violated

Article 151 of the Mineral and Coal Law, as stated in Law 2/2025, mentions that violations of Articles 70 and 70A can result in written warnings, fines, temporary suspension, or revocation of the IPR. Government Regulation 39/2025 adds two points. First, the Minister may revoke the permit immediately without warning if the activities damage the environment and do not apply good mining principles (Article 188). Second, obligations to the state must still be fulfilled even if the IPR has been revoked or expired, and former holders who continue to mine afterward are considered to be mining without a permit and subject to sanctions (Article 188A).

For rock mining outside the people's mining scheme, the process is different. Compare with SIPB and its 50-hectare limit. If you prefer to hear the obligations of the IPR explained directly, there is a clip here.